In the shampoo market, the expression “sulphate-free” is often used to indicate the absence of certain sulphated surfactants. However, consumers may attribute to it automatic properties of mildness or better tolerance that do not follow from the name of the ingredient alone. Performance depends on the complete cleansing system, the pH, the conditioning agents and the conditions of use.
Building a formula around the target experience
Before asking for a formula, specify the audience, the hair type, the need for foam, the washing frequency and the expected feel. Viscosity, rinsing and compatibility with the bottle also contribute to the result. A product can be free of a specific surfactant while remaining unsuited to the target. The formulation must therefore be judged on its properties and on the relevant tests.
Claims and documents
Check the INCI list, define exactly which ingredients are excluded and document the messages used. Avoid claiming that an authorised ingredient is dangerous simply to promote its absence. In Europe, cosmetic claims are governed by common criteria and the evidence must be suited to the message communicated.
Tool: a sulphate-free shampoo brief template with use, sensory criteria, excluded composition and the necessary validations.
Points to approve in your file
For each of the following elements, write down the decision taken, the person who approves it and the document that can justify it:
- Surfactants.
- pH.
- Tolerance.
- Foam.
- Label.
- Evidence for the claim.

Frequently asked question
Is a sulphate-free shampoo necessarily milder?
No. Mildness depends on the whole cleansing system, the concentrations, the pH and the use. The mere absence of one category of surfactants is not sufficient evidence.
Apply this guide to your project
To apply this guide, document two elements first: the surfactants and the pH. If an industrial study is needed, specify the products, indicative volumes, packaging and countries of sale concerned. The BIOCYLAB team can examine this information according to the actual scope of the project; quantities, lead times and services must be confirmed before any decision.





