The decision to produce a cosmetic in Morocco to sell it in Europe has an industrial side and a side concerning compliance with the destination market. Development must take into account from the outset the safety requirements, files, statements and procedures required for marketing. It is risky to manufacture a full stock and then look afterwards for the documents that should have accompanied the design.
Build the schedule backwards
Start with the desired launch date. Then place the choice of formula and packaging, the appropriate tests, the safety assessment, the preparation of the PIF, the labelling, the appointment of the Responsible Person, the notification procedures and transport. Some tasks can progress in parallel, but others depend on a frozen formula or container. The schedule must include decision points and a margin for corrections.
Clarify the documents supplied by each partner
The laboratory manufactures and provides the data relating to its activities; the importer, the brand owner, the Responsible Person and the regulatory service providers may each have to complete the file. A list of deliverables appended to the quote limits grey areas. Support in the event of a quality deviation, a recall or a formula change must also be anticipated.
Suggested diagram: the project pathway from the French brief to the first unit sold, with documents, people responsible and approvals at the critical stages.
Points to approve in your file
For each of the following elements, write down the decision taken, the person who approves it and the document that can justify it:
- Formulation.
- Tests.
- Label.
- Responsible Person.
- Import.
- Notification.

Frequently asked question
Can the product be shipped to Europe before the file is complete?
Shipping and marketing are two different operations. The obligations applicable to importation, the holding of goods and placing on the market must be examined with the competent parties before planning the operation.
Apply this guide to your project
To apply this guide, document two elements first: the formulation and the tests. If an industrial study is needed, specify the products, indicative volumes, packaging and countries of sale concerned. The BIOCYLAB team can examine this information according to the actual scope of the project; quantities, lead times and services must be confirmed before any decision.




