A shower gel used daily in a hotel or a hammam must remain easy to transport, store and dispense. A large container often reduces the number of packages handled, but becomes less practical when it is heavy, hard to empty or frequently opened. The choice must take into account the rate of consumption, the storage space and the dispensing system.
Comparing formats without getting it wrong
Calculate the delivered cost per litre, then add the accessories needed for use: pump, tap, refill station or transfer equipment. Assess the risk of contamination during handling, the losses left at the bottom of the can and the management of empty packaging. Do not assume that a large volume is always more environmentally friendly: the complete system must be studied.
Formula checks
Check the fragrance, viscosity, container integrity and storage conditions. A refill intended for dispensers fixed in guest rooms must also be compatible with these devices. Each refill operation must follow an appropriate hygiene procedure and traceability; it is not simply a matter of transferring a product into an unknown bottle.
Sheet to build: estimated monthly consumption, restocking frequency, number of openings, residual volume, logistics cost and refill procedure.

Points to approve in your file
For each of the following elements, write down the decision taken, the person who approves it and the document that can justify it:
- Consumption.
- Storage.
- Refilling.
- Handling.
- Losses.
- Full cost.
Frequently asked question
Is a 20 L can necessarily better suited to a hotel than a 5 L one?
Not necessarily. The choice depends on consumption, handling, the refill method, how often the container is opened and the storage space. A lower cost per litre can hide losses or more complex use.
Apply this guide to your project
To apply this guide, document two elements first: the consumption and the storage. If an industrial study is needed, specify the products, indicative volumes, packaging and countries of sale concerned. The BIOCYLAB team can examine this information according to the actual scope of the project; quantities, lead times and services must be confirmed before any decision.




